4-week turnaround from key collection
Kitchen, two wardrobes, TV console, shoe cabinet.
CNC-precision built-ins, E1-certified boards, push-to-open finish. Engineered for your 4-room BTO and delivered in 4 weeks — direct from our Senai factory.
A complete carpentry package built around a typical 4-room HDB BTO.
Singapore's high-tech, sustainable carpentry studio.
Every millimetre of your 3D design is translated directly to CNC machinery. No on-site cutting drift.
Premium melamine particleboards meeting strict E1 standards for low formaldehyde emission. Safer for families.
We don't outsource. Every cabinet built in our integrated 3D-to-CNC facility — 4-week BTO timeline.
Eight projects completed in the past six months.
Kitchen, two wardrobes, TV console, shoe cabinet.
Family with toddlers. Soft-close on every drawer.
Full-height wardrobes with concealed handles.
Pull-out kitchen organisers, internal wardrobe drawers.
Kitchen veneer face panel and TV wall accent.
Site measurement Monday, factory order Friday.
Hand-holding through design, materials, delivery, install.
Extended shoe cabinet with mirror panel at entrance.
"Took them only 3.5 weeks for our 4-room BTO. Push-to-open wardrobes are spotless and they came in exactly on the quoted price."
"Arimokko was the only one who showed us the CNC factory before we paid. We trusted them straight away."
"Locked price stayed locked. Sales replied to WhatsApp in under 10 minutes every time."
Every package uses the same CNC build and E1 boards.
We'll measure your unit and send a CNC-ready 3D design with locked pricing — no obligation. Reply within 10 minutes during business hours.
Our team will WhatsApp you shortly.
Faster for a same-day quote.
Message Us on WhatsApp123 Showroom Address, Singapore — open daily 11am–7pm
If your question isn't here, WhatsApp us.
Yes — we lock in your design and order materials up to 3 weeks before key collection. Install begins the week your keys are released.
We hold your slot and reschedule install at no charge. Materials stored in our Senai factory until you're ready.
Built-in carpentry that doesn't touch structural walls is permit-exempt. We handle paperwork for electrical/plumbing changes.
Site measurement, CNC-ready 3D plan, material samples, locked written quote. No obligation.
Yes, up until production begins (typically 5 days after deposit). Once CNC cuts, changes become expensive.
5 years on carpentry workmanship, 2 years on hardware. Certificates emailed at handover.